
Add to Cart
Red Synthetic Rubber Jogging Track All Weather Athletic Track Flooring
Product Description
-Sdong Sports Synthetic Rubber Jogging Track Athletic Track Flooring Material.
-The prefabricated rubber track roll is divided into two layers: the upper layer is a wear-resistant layer with 3-5mm deep concave convex grain, which provides the friction and elasticity required by the track; the lower layer is a square frame structure with 6-10mm deep inclined angle, which provides the impact absorption and main elasticity required by the track.The feature of this structure is that it can gather the scattered reflection force relatively, and act on the athletes from the angle that accords with the forward direction of the athletes to improve their performance.
Jogging Track Material Quick details
Force Reduction | 39 | ||
Tensile Strength | 0.84 | ||
Elongation at break | 80 | ||
Modified Vert. Deform. | 1.9 mm @ 23°C [75°F] | ||
Friction | 0.64/48 | ||
Permeability | Impermeable |
The Excellent Sport Performance
1.Strong friction and grip,even perform well in wet climate.
2.Excellent shock absorption and resilience.
3.Factory prefabricated and product quality is completely controllable.
4.The best tear-resistance,can withstand a higher load existed in various applications.
5.IAAF certificated products for national and international competition.
More Test Data | |||
Test Item | Reference | Standard Data | Test Result |
Tensile | IAAF | ≥0.5 | 0.84 |
Elongation at Break | IAAF | ≥40 | 80 |
Force Reduction | IAAF | 35-50 | 39 |
Vertical Deformation | IAAF | 0.6-2.2 | 1.6 |
Skid Resistance | IAAF | ≥47 | 57 |
Hardness Shore A | GB/T 14833-2011 | 45-60° | 45-55° |
Fire Rating | GB/T 14833-2011 | I Degree | I Degree |
Color Stability |
| Good | |
Chemical Resistance |
| Good |
Product categories
We have 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.
Jogging Track Material Installation:
1) Ground requirements:Cement, or, Asphalt. The ground should be smooth enough.
2) Glue(Two Components Polyurethane Adhesive) is needed to paste the track to the ground.
3) Different tools is needed for installation, such as rulers, small trailer, mixer, barrels, bricks, cutting knifes and so on.
Our Services
Best service: Any inquiry will be replied in 24 hours. Timely and professional service all the time.
Best price: Reliable factory, direct selling and favorable price for you!
Free sample: Provide free sample within 2kg, you just need to pay for the sample Express fee.
After-sale service: Provide free training lesson for our overseas distributor or buyer, professional
product & construction knowledge for you.
Jogging Track Material Project case
Application
Professional type: for athletic field of Olympic, continental championship, professional training.
Standard type: for athletic field of high school, university, physical college, sports center, stadium.
Conventional type: for athletic field of primary school, high school, college, university, gymnasium.
Indoor, outdoor table tennis, basketball, badminton and other kinds of course.
Manufacturing
The major categories of products we formulate and produce include:
Primers
Adhesives
Coatings
Aromatic Structural Sprays
Aliphatic Structural Sprays
2-C Elastomer Sealers
Aliphatic Encapsulated Sprays
2-C Full Depth Elastomer
Aromatic Binders
Indoor 2-C Elastomer for Pad and Pour Systems.
FAQ:
Q1: Are you a factory or a trade company?
A1: We are an industry and trade company.Welcome to China factory inspection.
Q2: What is thickness for the IAAF Running Track?
A2: The International Standard thickness is 13mm. Other sizes are available as your request.
Q3: Can we get installation support if we have no own constructors?
A3: We can send salesmen and technical support to your country to assist the installation.
Q4: Are your running track materials safety?
A4: Yes, our materials are safe. Environmentally friendly and recyclable.
Q5: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
Q6: What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q7:What is the Production time?
A:It is about 10-15days.
Q8:What are the options for the base construction of a running track.?
A:The ground is based on asphalt or concrete.
Q9:What is the life Span for Running track?
A:The life span is about 10-15years.